Warning: unlink(/var/www/html/CSAXPERT/storage/cache/cache.catalog.language.1782877287): No such file or directory in /var/www/html/CSAXPERT/system/library/cache/file.php on line 68

Preventive

Preventive measures are to be taken based on a prediction before it happened. The following preventive measures are recommended for flash flood:

• Development of proper drainage system

• Proper and timely warning system

• Strengthening the bank of wetlands/river 

• Strengthening and raising field bund 

• Community nursery should be adopted.

• This district have sporadic flood, hence selection of suitable variety of short or medium duration (based on time left in cropping period) after receeding of water is helpful.